South Entrance
Upper South Road
Ravine view
Communal pool at night
South entrance roundabout
Communal Pool
Orchard
Ravine view
Southern view over the 7th hole
Upper South Road
Communal pool
Communal pool at night
North Road
Communal pool at dusk
Southern View
Aphrodite Hills entrance view
Communal pool at night
Communal pool at dusk
Communal pool
Communal pool at night
Communal pool at night
Communal pool at dusk
Communal pool at dusk
Communal pool at dusk
Communal pool
Communal pool at dusk
5 Comments

Adonis Village: Request for External Change –  Unit A2

 

Description of proposed external change:

Cover parking with Swimming pool identical way and Materials

 

Dimensions and sizes of external changes:

A 2 Parking 

 

Colours and style of materials to be used:

Swimming pool identical Materials

 

Images or plans of site where external change will be made:

IMG 0419IMG 0418

Any images from suppliers of materials to be used:

 
1 Comment

Adonis Village - Request for external change – J2

 

A request is made by the owners of J2 for an external change to their property in line with the agreed Adonis Village procedure. 

In common with other owners of town houses in Adonis there is a large ground floor space at the back of the property. The owners of J2 are seeking permission to add one external window and shutter to the area.

Facing the property from the back, the window would be to the right hand side of the garage door. 

These alterations will not increase the size of the property or any boundaries, only increase the amount of natural light and fresh air into the home.

The style of the window on the back of the property will be exactly the same as the others throughout the house to ensure compatibility.

The window will be PVC and exactly the same colour as other PVC windows already installed in Adonis, in accordance with the agreed village colours.

The shutter will be made of aluminium and again exactly the same colour as other green aluminium shutters already installed in Adonis.

The window and shutter will be supplied by one of the 2 approved Adonis suppliers.

2 Comments

Adonis Village: Request for External Change – J3

 

A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.

The owners of J3 propose to replace the existing ceramic tiles on the first floor terrace above the garage in their town house. This change will improve the waterproofing of the tiles and stop damp problems in the garage below.

The new tiles will be of a similar colour (beige) though slightly larger than the existing tiles to minimise the number of joins. The tiles will not be easily seen by any other property as this is the end property at the north end of the Village.

 

AV Management Committee

June 2020


2 Comments

Adonis Village: Request for External Change – J3 (Retrospective)

 

A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.

 

The owners of J3 would like to add coping stones to the front elevation of the property. Ie flat 3 cm thick stone slabs which will be added along the top outside edge of the building. This addition is to help with both the waterproofing and to enhance the appearance of the property.

 

It is in keeping with the rest of Adonis Village and at least 1 other property already has it.

 

AV Management Committee

June 2020


2 Comments

Adonis Village: Request for External Change –  Unit O1

 

A request is made by the owners of O1 for an external change to their property in line with the agreed Adonis Village procedure.

As has already been carried out in a number of other properties within the Village, the owners of O1 would like to convert the bedroom window to a French patio-door by extending the drop (the width remaining the same) of the bedroom window looking out over the patio and therefore providing access to this patio.

The new window will be made of uPVC exactly as all other replacement windows and an aluminium shutter will also be added. This will be supplied by Malcom Morley and installed by Nicos Demetriou.

The supplier will guarantee that the replacement patio-door and shutters will be exactly the same design (look and style) in terms of dimensions and features as those that already exist. It will match the official colours of Adonis Village and will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as is the case with the other properties that have changed their windows and doors.

As mentioned above, the installation will be carried out by one of the two approved suppliers as advised by Mrs. Evi Leantzi (Cybarco) and will be completed as soon as possible once approval has been received.

 

Adonis Village Management Committee

12 June 2020


2 Comments

Adonis Village: Request for External Change –  unit H2

 

A request is made by the owners of H2 for an external change to the above named property strictly in line with the agreed Adonis Village Procedure.

The owners of H1 wish to replace the existing small toilet window with UPVC alternative for window as it is rotten.


The supplier will guarantee that the replacement of the window will be exactly the same design in terms of dimensions and features. It will also match the official colours of Adonis Village. The new product will not look discerningly different from the existing one from a reasonable distance of 10 metres or so, in keeping with the other properties that have changed their windows and doors.

The work will be carried out by one of the two Adonis Village approved suppliers.

 

Adonis Village Management Committee

May 2020


Write a comment

Adonis Village: Request for External Change –  unit N4

 

A request is made by the owners of N4 for an external change to the above named property strictly in line with the agreed Adonis Village Procedure.


The owners of N4 wish to replace all existing doors and windows with UPVC alternative for the doors and windows. This has already been carried out by multiple owners to improve security as well as insulation of the property.


The supplier will guarantee that all replacement doors and windows will be exactly the same design in terms of dimensions and features. They will also match the official colours of Adonis Village. All new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres or so, in keeping with the other properties that have changed their windows and doors.
The work will be carried out by one of the two Adonis Village approved suppliers.


Installation, subject to AVMC approval, is planned to take place during Summer/ Autumn of 2020.

 

Adonis Village Management Committee

May 2020


Write a comment

Adonis Village: Request for External Change – J2

                                                                                                                       

A request is made by the new owner of J2 to make a number of external changes to the property in line with the agreed Adonis Village procedure. The property has been empty for some time and is in need of a major refurbishment.

 

Windows, Doors & Shutters

As has already been carried out by a number of other owners, the owner of J2 would like to replace all existing doors and shutters with a UPVC alternative for windows and doors and aluminium shutters.


This is to improve the security, heating and insulation of the property during the winter months, and overall energy efficiency of the property.


The supplier will guarantee that all replacement doors and windows will be exactly the same design in terms of dimensions and features, and match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.


The supplier to be chosen will be one of the 2 approved Adonis suppliers.

 

Fence

The owners wish to install a wooden fence adjoining J1 at the front of the building. The fence will be of similar style and size to the one on the other side and will be painted in the correct Adonis brown paint used on all external wood.

 

Pergola cover

The owners wish to cover the pergola in the front garden and pergola of the bedroom on the first floor with the same polycarbonate materials used on the property B3. The cover will provide protection from the sun and rain. The pergolas will also be painted using the correct paint supplied by Adonis Village.

 

Awnings

The owners would like to install 2 awnings over their balcony on the ground at the back of the property. The awning will be approximately 3 metres in length. It will be of the usual soft material used on other properties in Adonis and will be the same beige colour matching the walls and other sunshades on properties nearby within Adonis.

 

Balcony hand rails

The owner wishes to replace all the wooden hand rails on the balconies that have become rotten. To ensure that they are the correct wood and style they will be supplied by the Adonis maintenance team at cost, who will also supply the correct paint that must be used.

 

Post box

The owners wish to install a decent sized post box outside the front door.

 

Stone ‘coping’ stone

The owner wishes to add a stone ‘coping’ strip on top of and all around the edge of the building which can help with protection of the walls below. These are shown on D1 below.

 

J2 2020 Coping stones

 

Adonis Village Management Committee

May 2020


Write a comment

Adonis Village: Request for External Change – U3

                                                                                                                       

A request is made by the owners of U3 for an external change to their property In line with the agreed Adonis Village procedure.

As has already been carried out by a number of other owners, the owners of U3 would like to replace all of their existing shutters with an aluminium alternative.

The supplier will guarantee that the shutters will be exactly the same design In terms of dimensions and features, and also match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their shutters.

The installation will be carried out by one of the two approved Adonis suppliers, and completed within 6 months following approval.

 

Adonis Village Management Committee

11 November 2019