Adonis Village: Request for External Change – C4
A request is made by the owners of C4 for an external change to their property in line with the agreed Adonis Village procedure.
As has already been carried out by a number of other owners, the owners of C4 would like to replace all their existing windows, doors, front door and shutters with a uPVC alternative for windows and doors, and aluminium for shutters.
This is to improve the heating and insulation of the property of the property during the winter months, and overall energy efficiency of the property.
The supplier (Morley) will guarantee that all replacement doors, windows and shutters will be exactly the same design in terms of dimensions and features, and match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.
AV Management Committee (25/4/17)

Adonis Village: Request for External Change – Q1
A request is made by the owners of Q1 for an external change to their property in line with the agreed Adonis Village procedure.
As has already been carried out by a number of other owners, the owners of Q1 would like to replace all their existing windows, doors and shutters with a uPVC alternative for windows and doors, and aluminium for shutters.
This is to improve the security, and heating and insulation of the property during the winter months, and overall energy efficiency of the property.
The owner and the supplier guarantee that all replacement doors, windows and shutters will be exactly the same design in terms of dimensions and features, and match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.
The supplier to be chosen will be one of the 2 existing suppliers that have, or are in the process of supplying the same windows and shutters to other owners in Adonis Village.
The installation will be some time in 2017 to suit the owners and Installation Company.
AV Management Committee (27/6/17)

Adonis Village: Request for External Change – J3
J3 is the very last house at the north end of Adonis Village and as such no other Adonis property overlooks it.
The owners have a pergola at the side of their property, which cannot be seen by any other Adonis property. This pergola is becoming old and the owners would like to replace it with a new one (see attached photo).
The sizes would be similar to current one, namely 4 x 4m or 4 x 3m, but no larger. The design will be exactly the same as the picture. The roof will be tiled in the same roof tiles used on the J3 property. It will not be attached to the house at any point and the side will remain open as shown.
The owners understand that the maintenance of the pergola will be their sole responsibility and not part of the village maintenance program.
Existing:
New proposed:
AV Management Committee (10 July 2017)

Adonis Village: Request for External Change – P2
A request is made by the owners of P2 for an external change to their property in line with the agreed Adonis Village procedure.
As has already been carried out by a number of other owners, the owners of P2 would like to replace all their existing windows, doors and shutters with a UPVC alternative for windows and doors, and aluminium for shutters.
This is to improve the security, and heating and insulation of the property during the winter months, and overall energy efficiency of the property.
The owner and the supplier will guarantee that all replacement doors, windows and shutters will be exactly the same design in terms of dimensions and features, and match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.
The supplier to be chosen will be one of the 2 existing suppliers that have supplied the same windows and shutters to other owners in Adonis Village.
As part of this improvement, the owners will install an additional patio door and shutter at the back of their property in the garage wall to allow light and fresh air into the basement area of their townhouse. Once again, this will be completely in line with the agreed specification and colour as above, and the size will be the same as that of the Living Room on the ground floor on the same side of the house, both doors and shutter, to ensure compatibility.
The installation will be some time in 2017 to suit the owners and installation company..
AV Management Committee (26/6/17)

Adonis Village: Request for External Change – Q1
A request is made by the owners of Q1 for an external change to their property in line with the agreed Adonis procedure.
The owners would like to erect a small containment curb/wall to their sloping front garden as it drops to the common path.
The problem has been caused by water continually washing away the earth down the sloping garden.
The wall will contain the sliding earth towards the common walkway and to avoid any slipping hazard for pedestrians.
The wall will be of same stone as the existing containment walls of the common gardens and will be a maximum height of 450mm which will be 300mm below the top of the side wall, reducing to a maximum of 80mm where it meets the path.
Garden plants will be planted behind the wall to help any further earth erosion and to make the front garden more attractive.
AV Management Committee (23 October 2017)