The Adonis Village Planning Application procedure can be read here.

Adonis Village: Request for External Change – J3
A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.
The owners of J3 propose to replace the existing ceramic tiles on the first floor terrace above the garage in their town house. This change will improve the waterproofing of the tiles and stop damp problems in the garage below.
The new tiles will be of a similar colour (beige) though slightly larger than the existing tiles to minimise the number of joins. The tiles will not be easily seen by any other property as this is the end property at the north end of the Village.
AV Management Committee
June 2020

Adonis Village: Request for External Change – J3 (Retrospective)
A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.
The owners of J3 would like to add coping stones to the front elevation of the property. Ie flat 3 cm thick stone slabs which will be added along the top outside edge of the building. This addition is to help with both the waterproofing and to enhance the appearance of the property.
It is in keeping with the rest of Adonis Village and at least 1 other property already has it.
AV Management Committee
June 2020

Adonis Village: Request for External Change – unit H2
A request is made by the owners of H2 for an external change to the above named property strictly in line with the agreed Adonis Village Procedure.
The owners of H1 wish to replace the existing small toilet window with UPVC alternative for window as it is rotten.
The supplier will guarantee that the replacement of the window will be exactly the same design in terms of dimensions and features. It will also match the official colours of Adonis Village. The new product will not look discerningly different from the existing one from a reasonable distance of 10 metres or so, in keeping with the other properties that have changed their windows and doors.
The work will be carried out by one of the two Adonis Village approved suppliers.
Adonis Village Management Committee
May 2020

Adonis Village: Request for External Change – Unit O1
A request is made by the owners of O1 for an external change to their property in line with the agreed Adonis Village procedure.
As has already been carried out in a number of other properties within the Village, the owners of O1 would like to convert the bedroom window to a French patio-door by extending the drop (the width remaining the same) of the bedroom window looking out over the patio and therefore providing access to this patio.
The new window will be made of uPVC exactly as all other replacement windows and an aluminium shutter will also be added. This will be supplied by Malcom Morley and installed by Nicos Demetriou.
The supplier will guarantee that the replacement patio-door and shutters will be exactly the same design (look and style) in terms of dimensions and features as those that already exist. It will match the official colours of Adonis Village and will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as is the case with the other properties that have changed their windows and doors.
As mentioned above, the installation will be carried out by one of the two approved suppliers as advised by Mrs. Evi Leantzi (Cybarco) and will be completed as soon as possible once approval has been received.
Adonis Village Management Committee
12 June 2020

Adonis Village: Request for External Change – unit N4
A request is made by the owners of N4 for an external change to the above named property strictly in line with the agreed Adonis Village Procedure.
The owners of N4 wish to replace all existing doors and windows with UPVC alternative for the doors and windows. This has already been carried out by multiple owners to improve security as well as insulation of the property.
The supplier will guarantee that all replacement doors and windows will be exactly the same design in terms of dimensions and features. They will also match the official colours of Adonis Village. All new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres or so, in keeping with the other properties that have changed their windows and doors.
The work will be carried out by one of the two Adonis Village approved suppliers.
Installation, subject to AVMC approval, is planned to take place during Summer/ Autumn of 2020.
Adonis Village Management Committee
May 2020