The Adonis Village Planning Application procedure can be read here.

5 Comments

Adonis Village: Request for External Change –  Unit A2

 

Description of proposed external change:

Cover parking with Swimming pool identical way and Materials

 

Dimensions and sizes of external changes:

A 2 Parking 

 

Colours and style of materials to be used:

Swimming pool identical Materials

 

Images or plans of site where external change will be made:

IMG 0419IMG 0418

Any images from suppliers of materials to be used:

 
1 Comment

Adonis Village - Request for external change – J2

 

A request is made by the owners of J2 for an external change to their property in line with the agreed Adonis Village procedure. 

In common with other owners of town houses in Adonis there is a large ground floor space at the back of the property. The owners of J2 are seeking permission to add one external window and shutter to the area.

Facing the property from the back, the window would be to the right hand side of the garage door. 

These alterations will not increase the size of the property or any boundaries, only increase the amount of natural light and fresh air into the home.

The style of the window on the back of the property will be exactly the same as the others throughout the house to ensure compatibility.

The window will be PVC and exactly the same colour as other PVC windows already installed in Adonis, in accordance with the agreed village colours.

The shutter will be made of aluminium and again exactly the same colour as other green aluminium shutters already installed in Adonis.

The window and shutter will be supplied by one of the 2 approved Adonis suppliers.

2 Comments

Adonis Village: Request for External Change – J3 (Retrospective)

 

A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.

 

The owners of J3 would like to add coping stones to the front elevation of the property. Ie flat 3 cm thick stone slabs which will be added along the top outside edge of the building. This addition is to help with both the waterproofing and to enhance the appearance of the property.

 

It is in keeping with the rest of Adonis Village and at least 1 other property already has it.

 

AV Management Committee

June 2020


2 Comments

Adonis Village: Request for External Change – J3

 

A request is made by the owners of J3 for an external change to their property in line with the agreed Adonis Village procedure.

The owners of J3 propose to replace the existing ceramic tiles on the first floor terrace above the garage in their town house. This change will improve the waterproofing of the tiles and stop damp problems in the garage below.

The new tiles will be of a similar colour (beige) though slightly larger than the existing tiles to minimise the number of joins. The tiles will not be easily seen by any other property as this is the end property at the north end of the Village.

 

AV Management Committee

June 2020


2 Comments

Adonis Village: Request for External Change –  Unit O1

 

A request is made by the owners of O1 for an external change to their property in line with the agreed Adonis Village procedure.

As has already been carried out in a number of other properties within the Village, the owners of O1 would like to convert the bedroom window to a French patio-door by extending the drop (the width remaining the same) of the bedroom window looking out over the patio and therefore providing access to this patio.

The new window will be made of uPVC exactly as all other replacement windows and an aluminium shutter will also be added. This will be supplied by Malcom Morley and installed by Nicos Demetriou.

The supplier will guarantee that the replacement patio-door and shutters will be exactly the same design (look and style) in terms of dimensions and features as those that already exist. It will match the official colours of Adonis Village and will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as is the case with the other properties that have changed their windows and doors.

As mentioned above, the installation will be carried out by one of the two approved suppliers as advised by Mrs. Evi Leantzi (Cybarco) and will be completed as soon as possible once approval has been received.

 

Adonis Village Management Committee

12 June 2020