Adonis Village: Request for External Change –  unit C5

 

A request is made by the owner of C5 for an external change to their property in line with the agreed Adonis Village procedure.

As has already been carried out by a number of other owners, the owner of …C5.  would like to replace all their existing windows, doors with a uPVC alternative for windows and doors.

This is to improve the security, and heating and insulation of the property during the winter months, and overall energy efficiency of the property.

The supplier will guarantee that all replacement doors and windows will be exactly the same design in terms of dimensions and features and match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.

The supplier to be chosen will be Mr Morley that has, supplied the same windows and shutters to other owners in Adonis Village.

2 July 2019

Write a comment

Adonis Village: Request for External Change – P1

 

A request is made by the owners of P1 for an external change to their property In line with the agreed Adonis Village procedure. 

As has already been carried out by a number of other owners, the owners of P1 would like to replace all of their existing windows, doors (with the exception of the front door and kitchen door) and shutters with a UPVC alternative for windows and doors and aluminium for the shutters.

This is to improve the security, heating and Insulation of the property during the winter months and the overall energy efficiency of the property.

The supplier will guarantee that all replacement doors, windows and shutters will be exactly the same design In terms of dimensions and features, and also match the official colours of Adonis Village. The new products will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as with the other properties that have changed their windows and doors.

The supplier to be chosen will be James Holmes, who has supplied the same Windows and shutters to other owners In Adonis Village.

The Installation will be carried out some time in 2019 to suit the owners and Installation Company.

 

09/06/2019

Write a comment

Adonis Village: Request for External Change – unit no M1

 

The owners of M1 would like to install a new narrow roof cover to protect the side of the building and cover the four exposed AC compressor units.

The proposed materials will be the same roof pantiles as used elsewhere in Adonis Village on the roof of all blocks and will appear the same as those used to cover the electrical housing at the side of each block (see photo below).

The objective is twofold, firstly water causing damp inside the property enters the outside through the gaps between the outside wall and the plinth below the AC units (see photo below).. Secondly, the AC units are exposed to the elements and cause the units to deteriorate far sooner than their expected life span and look unsightly.

The new roof cover will extend only so far as to cover the AC units approximately 300 -400 mm and divert rain away from the units and the wall. The roof will extend along most of the side wall and will not have any side wall or front cover except as needed to support the roof. The owners plan to replace all the AC units once the roof protection has been approved and implemented.

The proposed roof will not be seen from the road and is only exposed to the rear and is in any case in keeping with the same tile, shape, type, colour and aesthetics of Adonis Village.

M1 2019 AC cover

Above photo shows the existing situation where rain water enters the gaps between the plinth beneath the AC units and the wall.

M1 2019 AC Cover Roof Tile

The above photo is an example of the electrical housing on each block with the type of roofing that is proposed to cover the AC units.

Owners of M1 Adonis Village

21 April 2019

Write a comment

Adonis Village: Request for External Change – I1

 

A request is made by the owners of I1 for an external change to their property In line with the agreed Adonis Village procedure.

The owners would like to move a window and wall slightly outwards taking part of the balcony area, as shown on the diagram and photo below. The proposed new wall is shown in a thick red line. The plan is to move it out only in line with the existing front line of the dining room, and not all the way to the line of the existing lounge.

The room to be extended is a bedroom at the back of the house, on the first floor. The owners would like to extend this bedroom to allow sufficient space to install an invalid bed with electronic lifting and other equipment to aid the elderly owner who is in his late 80’s.

The work will be carried out by the Adonis Maintenance Manager so it will be completely in line with the Village existing materials and colours. The existing window and shutters will be re-installed.

As it is on the first floor at the rear of the property, and in a recessed area, it will hardly be noticeable from the road, and will not be overlooked by any other Adonis property.

The owners would like to go ahead with this change as soon as possible following the end of the Request for Change process.

 

I1 2019 extension plan

I1 2019 Extension photo

 

Adonis Village

1/6/19

Write a comment

Adonis Village: Request for External Change – R2

 

I would like to do the following to the garden of R2, Adonis Village.

  • I would like to lay artificial grass.
  • I would like to erect a fence on the back and sides of the garden, preferably around 1.5m in height, like the rest.

The garden ends on the main road of the resort and is very exposed and has zero privacy.

The fence I would like to erect will be a maximum of 1.5 metres in height, will be of natural wood material and be varnished in the same colour as the rest of the wooden structures in the village.

The fence design could be the same as the ones of the other main road outside E block which is in and out wood panelling or wood panels.

 

George Elias 

4 April 2019