The Adonis Village Planning Application procedure can be read here.

3 Comments

Adonis Village: Request for External Change –  Unit L1 

Description of proposed external changes

Entrance door must be changed in the house no. L01

due to the reason that the old one is already destroyed by humidity.

Dimensions and sizes of external changes:

 900x2000

Colours and style of materials to be used:

Rehau, euro design 70

Nussbaum color

Rampote 

uf=1,3

up=10,0

Ud=1,3

 

 

Images or plans of site where external change will be made:

door.jpeg

Any images from suppliers of materials to be used:

 
1 Comment

Adonis Village: Request for External Change –  Unit P2

Description of proposed external change: 

Change one door white color for another one white color in covered parking

Dimensions and sizes of external changes:

metall white door apr 300x250

Colours and style of materials to be used:

metall white door

Images or plans of site where external change will be made: 

 

WAS 

PHOTO 2023 11 24 15 55 39 1

WILL BE 

 

PHOTO 2023 11 24 15 55 53 1

Any images from suppliers of materials to be used:

 
1 Comment

Adonis Village: Request for External Change –  Unit [A5]

Description of proposed external change:

 Would like to get a quote on installing solar panels for electricity on roof or side roof of A5

Dimensions and sizes of external changes:

 N/A

Colours and style of materials to be used:

Images or plans of site where external change will be made:

 N/A

Any images from suppliers of materials to be used: n/A

 
3 Comments

Adonis Village: Request for External Change –  Unit [P2]

Description of proposed external change:

Installation of 17 photovoltaic modules of the AXIperfect FXXL WB type 415Wp-430Wp, and 1 inverter of the Solaredge type.

Dimensions and sizes of external changes:

Each module = 1722mm x 1134mm x 30mm;

Inverter = 540mm x 315mm x 260mm

Colours and style of materials to be used:

Axitec 415wp 430wp 1 page 0001

Axitec 415wp 430wp 1 page 0002

Images or plans of site where external change will be made:

WhatsApp Image 2023 11 20 at 13.55.47

Any images from suppliers of materials to be used:

se three phase inverter datasheet page 0001

se three phase inverter datasheet page 0002

 
11 Comments

Adonis Village: Request for External Change –  Unit U6

 

Description of proposed external change:

A request is made by the owners of U6 for an external change to their property in line with the agreed Adonis Village procedure.

As has already been carried out in a number of other properties within the Village (ie. U5, U4 amongst others) the owner of U6 would like to convert the bedroom window to a French patio-door by extending the drop (the width remaining the same) of the bedroom window looking out over the patio. The shutters will also be replaced for a metal version as per official materials and colour. This will therefore provide access to a patio which is to be tiled and new matching hand rail fitted to enclose the whole balcony perimeter.

The owner and supplier will guarantee that the replacement patio-door and shutters will be exactly the same design (look and style) in terms of dimensions and features as those that already exist. Patio tiles will also be matched (due to age, these will be as close as possible). It will match the official colours of Adonis Village and will not look discerningly different from the existing ones from a reasonable distance of 10 metres, as is the case with the other properties that have changed their windows and doors. Also, please note that the new bedroom patio-door is not visible by any neighbour, with only a view out over the ravine.

The window will be of similar design with the exception of them being UPVC French doors. 

The installation will be carried out by one of the two approved suppliers and will be completed in 2024, following the end of the Request for Change process and to suit the owners and installation company. The owner commits to completing the work during low season, in order to disturb as little owners/guests as possible. 

 

Dimensions and sizes of external changes:

Please see attached proposed elevation.  

 

Colours and style of materials to be used:

All materials and colours to be completely in line with the Villages existing materials and colours. 

  

Images or plans of site where external change will be made:

 

Please see attached proposed elevation and a photograph of property U5 that has already undertaken the same design.

 

Any images from suppliers of materials to be used:

 

IMG 5841IMG 7972