2025 Unit R1 - New Solar Panel Installation

We are applying to install a high-efficiency 5kW solar photovoltaic (PV) system. As the roof is designated as common property, the committee requires that we consult with you, our neighbours, before any approval is granted.


Our Goal: Our aim is to utilize sustainable energy and take part in the government's net metering scheme.


Technical Details:

  • Inverter: 1 x HUAWEI SUN2000-5KTL-L1 (a 5kW, modern, and quiet unit) .
  • Panels: 10 x Leapton 500W Solar Panels (Model: LP182*210-M-54-NB) .
  • Installer: All work will be performed by a certified, professional company (our proposed installer is GoSolar LTD).


Visual Impact (Our Main Priority):

We are very mindful of the community's shared aesthetic. Our plan has been specifically designed to ensure minimal to no visual impact.

  • The 10 panels will be located on the roof area directly above our unit.
  • They will be mounted flush, following the natural angle of the roof.
  • Crucially, the entire installation will be set back from the edge and will not protrude above the main roof ridge line. This design will make the panels virtually invisible from ground-level common areas and pathways.
  • The inverter will be installed discreetly on our external wall, next to our kitchen entrance, as marked on the plans submitted to the committee.
Say something here...
Cancel
You are a guest
or post as a guest
Loading comment... The comment will be refreshed after 00:00.
  • This commment is unpublished.
    AV Committee · 11:42 04/11/2025
    The Adonis Village Management Committee has received the above External Change Request (ECR) from the owner of R1 and it is now being EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.